The Balticconnector, a 150-kilometer long natural gas pipeline connecting Finland and Estonia, was sabotaged 3,200 kilometers north of Gaza. The pipeline, completed in 2019, is Finland’s only direct pipeline connection to the EU’s natural …

© 2024 ASIA MEDIA RESEARCH CENTER PVT. LTD. ALL RIGHTS RESERVED.