Germany’s debate over its future sixth-generation combat aircraft has intensified after the works council at Airbus Defence and Space’s Manching facility warned the government against joining the Global Combat Air Programme (GCAP), arguing that entering the British-Italian-Japanese initiative at this stage could leave German industry with limited influence and undermine the country’s ability to develop its own advanced military aircraft.
In a statement issued on November 23, 2026, the employee representatives called on the German government to immediately approve a national fighter development programme rather than commit to an existing international project in which Germany would have little control over aircraft design, technology and industrial responsibilities.
The works council said Germany needed to begin development without further political delays if the Bundeswehr, the German armed forces, was to receive a next-generation fighter before 2040.
“For the Bundeswehr to be able to deploy the system before 2040, the prototype must take its maiden flight as early as 2032,” the employee body said. “This timeline is technically feasible – provided the government acts immediately.”
The intervention comes as Berlin considers its options following the collapse of its partnership with France and Spain under the Future Combat Air System (FCAS), a multinational programme originally intended to develop Europe’s next-generation combat aircraft.
The Manching works council believes joining GCAP under its existing industrial arrangements could repeat the problems that ultimately undermined FCAS, leaving Germany dependent on foreign partners for critical technologies while weakening its domestic aerospace industry.
It described joining the British-Italian-Japanese programme as a strategic mistake and urged Chancellor Friedrich Merz’s government to establish a German-led development framework that could eventually accommodate additional European partners.
Germany’s withdrawal from FCAS earlier in 2026 followed months of disagreements between Airbus, representing German and Spanish industrial interests, and French aircraft manufacturer Dassault Aviation over the division of responsibilities and control of the Next Generation Fighter (NGF), the programme’s central combat aircraft.
The disagreements reflected fundamentally different approaches to industrial leadership and aircraft development. Dassault sought a dominant role in designing and developing the aircraft, while Airbus and German officials wanted a more balanced arrangement that would guarantee German industry meaningful access to technology, design authority and manufacturing responsibilities.
The dispute eventually made continued cooperation increasingly difficult, forcing Berlin to reconsider its long-term combat aviation strategy.
Since leaving FCAS, Germany has explored several alternatives, including joining GCAP, which is being developed by the United Kingdom, Italy and Japan.
German Chancellor Friedrich Merz raised the possibility of German participation during his October 2026 visit to Japan. British Prime Minister Andy Burnham has also directly invited Germany to join the programme.
However, Defence Minister Boris Pistorius has indicated that Berlin does not expect to make a definitive decision until the end of March 2027.
The Manching works council wants the government to reject the prospect of joining GCAP altogether.
Its chairman, Thomas Pretzl, warned that Germany should not repeat the political and industrial mistakes made during the fighter development partnership with France.
“We should not repeat the political mistakes made during the fighter jet development with France,” Pretzl said.
The concern is that Germany would enter GCAP after its founding partners had already established the programme’s industrial structure, negotiated responsibilities and agreed on the fundamental development framework.
Rather than shaping the aircraft from the beginning, German companies would have to negotiate their position within an existing arrangement.
GCAP is being developed through Edgewing, an industrial joint venture involving Britain’s BAE Systems, Italy’s Leonardo and Japan’s Mitsubishi Heavy Industries.
The partnership is responsible for designing and developing the next-generation combat aircraft and associated systems. The programme aims to deliver a new fighter by 2035, reflecting the participating countries’ requirements for future air superiority, advanced sensors, networking and integrated combat capabilities.
The three founding nations have already invested considerable political and industrial resources in establishing the programme’s structure.
Consequently, introducing another major partner could complicate existing agreements over funding, technology ownership, design authority and manufacturing responsibilities.
Italy has reportedly suggested that Germany could initially participate as an observer, providing Berlin with an opportunity to understand the programme without immediately becoming a full development partner.
However, an observer arrangement would leave Germany with limited influence over the aircraft’s architecture and industrial direction.
Even full membership would not necessarily guarantee Germany an equal position. Berlin could be expected to contribute substantial funding while receiving a comparatively smaller share of development and manufacturing work.
For Airbus employees in Manching, this represents the central problem with the GCAP option.
They fear that Germany could become financially committed to an aircraft whose fundamental design decisions and industrial responsibilities have already been determined by other countries.
The intervention also highlights differences between Airbus’s corporate management and its workforce.
Michael Schoellhorn, chief executive of Airbus Defence and Space, has previously indicated that the company remains open to cooperation with Britain, Italy and Japan, provided Germany receives substantial industrial responsibilities and leadership authority.
“What we’re ready to do is to join something or to build something where we have a significant portion of the work and the leadership. That’s currently being explored,” Schoellhorn said.
The works council, however, believes that securing such influence would be difficult once the existing GCAP partnership has progressed beyond its initial organisational stages.
The debate is particularly important for Airbus’s Manching facility in Bavaria, which employs approximately 6,500 people and represents one of Germany’s most important centres for military aircraft development.
The facility plays a central role in the final assembly of the Eurofighter Typhoon and supports a broad range of engineering, manufacturing, testing and maintenance activities.
However, the Eurofighter cannot sustain Germany’s combat aircraft manufacturing capabilities indefinitely.
As the aircraft approaches the later stages of its operational life and production eventually declines, Germany will need a successor programme to retain its aerospace engineering expertise and industrial infrastructure.
Without a new development initiative, the country risks losing capabilities accumulated over decades in aerodynamics, aircraft structures, propulsion integration, flight-control systems, mission computers, sensors and military aircraft certification.
The consequences would extend beyond the loss of manufacturing contracts.
A decline in domestic fighter development could also lead to the departure of experienced engineers, technicians and specialist suppliers, making it increasingly difficult for Germany to independently develop advanced combat aircraft in the future.
The works council argues that a national programme would preserve these capabilities while providing long-term employment and technological opportunities.
It also warned that continued government hesitation could lead to additional purchases of American-made F-35 fighters, potentially increasing Germany’s dependence on foreign suppliers.
“If the Chancellor’s office continues to hesitate, the purchase of further US [Lockheed Martin] F-35 jets is imminent,” the council warned.
It added that such a development could threaten the future of German military aviation.
“Politicians must act immediately, otherwise another industry in Germany will die.”
The warning reflects a broader strategic concern in Berlin: whether Germany wants to remain primarily an operator of advanced foreign-designed combat aircraft or retain the industrial and technological capabilities required to develop its own future systems.
One alternative that has attracted attention within German defence circles involves establishing a new fighter development partnership with Sweden and Spain.
Airbus chief executive Michael Schoellhorn expressed interest in cooperation with Sweden’s Saab during an interview with Swedish newspaper *Dagens Industri* in May 2026, indicating that he looked forward to working with the company on a next-generation fighter.
Such an arrangement could offer Germany a more balanced industrial position than entering GCAP at a relatively advanced stage.
A partnership between Airbus and Saab would bring together two European companies with substantial experience in developing modern combat aircraft.
Airbus has extensive expertise from the Eurofighter Typhoon programme, while Saab developed the Gripen family, including the advanced Gripen E.
Spain’s participation could further strengthen the proposed partnership by providing continuity for Airbus’s industrial interests and additional political and financial support.
The three countries could establish a joint development structure around a new sixth-generation aircraft, defining its operational requirements, technological architecture, funding arrangements and industrial responsibilities from the beginning.
This would give Germany greater opportunities to influence the aircraft’s design and ensure that its defence industry retains meaningful responsibility for critical technologies.
It could also allow the partners to develop an aircraft more closely aligned with European operational requirements rather than adapting German requirements to a programme originally structured around British, Italian and Japanese priorities.
However, a new partnership would face significant challenges.
Germany, Sweden and Spain would have to negotiate funding contributions, intellectual property arrangements, governance structures, technology sharing and manufacturing responsibilities.
Developing a new aircraft from the beginning could also create schedule and cost pressures, particularly if the partners struggle to agree on technical requirements.
Nevertheless, the proposal offers Berlin an opportunity to build a new European industrial partnership without immediately accepting the existing GCAP framework.
An internal German Defence Ministry assessment has reportedly encouraged officials to explore cooperation with Sweden and Spain rather than commit prematurely to the Japanese-British-Italian programme.
The Manching works council’s preferred approach is to establish a German-led development framework immediately, leaving the door open for other countries and manufacturers to participate later.
Under this model, German companies would initially define the aircraft’s architecture, technological priorities and industrial responsibilities before inviting additional partners.
The proposal does not necessarily rule out international cooperation. Instead, it seeks to ensure that Germany enters future partnerships from a position of industrial strength rather than negotiating its role after the programme’s fundamental structure has already been established.
Christian Moser, a member of the local parliament and an advocate for the interests of Airbus workers, has also supported the development of a German-led sixth-generation fighter.
“After the failure of FCAS with France, we now need a German consortium to develop the sixth-generation fighter jet,” he said.
“Germany must be able to shape its own security and must not become dependent on others for key technologies.”
Moser also argued that the Eurofighter should continue receiving upgrades while Germany develops its successor aircraft.
“Until the new jet flies, the Eurofighter must be further developed,” he said, adding that this would preserve capabilities in Manching while providing the German Air Force with modern technology.
The works council’s statement does not represent Airbus’s official corporate position, and its proposal has not been adopted as government policy.
Nevertheless, it underscores the industrial stakes surrounding Germany’s next-generation fighter decision.
Berlin now faces a difficult choice between entering an established multinational programme, building a new partnership with European manufacturers or pursuing a national development initiative that could eventually attract international participation.
With the GCAP partners targeting 2035 for their next-generation aircraft and the Manching workforce demanding a German prototype flight by 2032, the decision is becoming increasingly urgent.
For Germany, the question is no longer simply which fighter will replace the Eurofighter. It is whether the country can preserve the industrial expertise, technological independence and engineering capabilities required to remain a major combat aircraft developer in the decades ahead.